Reviewed by: Bergstrom, Leigh W.
Phone: 343-8326
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Andrew Earp
Phone: 343-8338
Email: Earpal@muni.org
Project: DAVE AND BUSTERS
Review Number: 385853
1) STATUS: 3-06-2017 Provide plumbing plans that are signed and sealed by the engineer of record. Comments to be addressed.
2) The following comments based upon the 2012 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.
3) MP0.1b Provide a gas piping schematic for all of the gas piping downstream of the gas meter, to include gas pressure(s), pipe sizes, PRV's, equipment loads and length of the longest run downstream of the PRV such that adequate pipe sizes may be verified.
4) P2.1 The beer and beverage conduits above the ceiling are required to be plenum rated per IMC 602.2.1.
5) P1.0 & P1.1b Cast iron or DWV copper waste lines serving beer and soda dispensers are not compatible with the waste byproducts disposed of at those locations. Acid resistant piping is to be installed to a point where sufficient dilution from other fixtures has been accomplished. Provide plan view details as to the extent of the acid resistant piping including the last tee connection. Be aware that acid resistant piping installed in return air plenums must also be plenum rated per IMC 602.2.1.
6) P4.1 Provide a copy of the specifications per General Note #22.
7) 1/P4.2 The water heaters require seismic straps per UPC 507.2.
8) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT. (23.10.104.8.1)