Structural Comments
Reviewed by: Hellman, Becky A. Permit#: X17-1012 for C16-1680
Phone: 343-8237 First Review
Fax: 249-7400 Date: 1-31-17
Email: hellmanba@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: Parkerrw@muni.org
Project: AirportTravel Service Center Lot 1A-4901 Spenard Road – Marriott Court Yard Addition
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by theMunicipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. FYI - The truss submittal isgenerally a deferred item to be checked, the approved design is generallyfollowed; in this case the deferred truss item has actually been changed from thedesign previously reviewed; therefore this is actually a change order that willhave to be charged for.
3. The following are comments thatneed to be addressed based on the new design of the truss layout:
A. Please identify the individualtrusses on the plan view sheet to identify which truss is which.
B. All truss to truss connectionsare required to be identified by the truss manufacture as DCI has pointed outon individual trusses CJ01, CJ02, EJ01, and HJ01. Please identify the hangers that will be usedfor the connection of the truss to truss.
C. It appears that the existingroof framing is being affected, in SSK 002, there was no indication that theexisting roof is affected with overframing. It appears that the proposed trusses V01 – V06 were not used and were replacedwith stick framing, details SSK-14D and SSK-14E. Generally trusses are designed with uniformloads, it’s not clear if the new stick framed area is loading the existingtrusses as they were designed for with uniform loads. Please provide justification that theexisting trusses are still adequate with the new loading type as shown with thestick trusses.
D. See SSK-014C; the use of the2x6’s leaves no room for insulation and ventilation. Please clarify how adequate insulation andspace for venting will be achieved in this new structural system as shown.
E. Without a plan overview, I’massuming that truss A04 is over the right shear wall line that called for thetruss to be designed as a drag truss with 2020 pounds drag load. I didn’t find this load in the individual designof this truss. Please clarify why thistruss is not loaded with the drag load.
F. See truss A01, there is a noteby the engineer that would indicate that this truss is not meeting the design andneeds to be fixed to meet the deflections specified by the engineer. Please provide a redesign of this truss forthe fix.
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additionalinformation that is provided to address the above comments could result inadditional comments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager for this project.