ENCLOSE BY METAL FRAMING SMALL WALLS, FINISH DRY WALL AND FRP. INSTALL ACOUSTICAL CEILING W/WASHABLE TILES, NEW STRIP LIGHTING AND OUTLET COVERS, REFRIDGE COIL UNIT TIE INTO EXISTING SYSTEM,
INSTALL VINYL STRIP DOOR, MMA FLOOR SYSTEM, TABLES, SHELVES, AND EQUIPMENT-SP.
Structural Comments
Reviewed by: Hellman, Becky A. Permit#: C16-2065
Phone: 343-8237 Second Review
Fax: 249-7400 Date: 12-13-16
Email: hellmanba@muni.org
Permit Manager: Sean Palmer
Phone: 343-8181
Email: palmersp@muni.org
Project: East GateLot 2C BLK 1A – 5600 Debarr Rd. – Safeway Alteration
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by theMunicipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. The description of work is notclear for the structural aspect of this project. What structurally is new? I see a 4” framedcolumn being identified, but that is it. Is this 4” column the only thing that is supporting the new vinylcurtains; header, fastening, right side attachment; all should be checked forout of plan internal wind pressures? Please provide information on thesupport/construction of the new curtain.
12-13-16 Calculations accepted. Please provide detail for the lateral supportof the columns on either side of the header; there is an out of plane lateralload that needs to be resisted.
3. A wall section was provided onsheet A101. Is this a new wall? Where isit going? Are walls being replaced? Oronly finishes? Please clarify on theplan where this wall section is being constructed. This wall section is required to have aregistered licensed Architect or Engineer stamp.
12-13-16 Not addressed. What will this wall section be used for?
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additionalinformation that is provided to address the above comments could result inadditional comments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager for this project.