Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: E16-2069
Permit Type: Commercial Trade Permit - Alteration Electrical
Address: E 401 6TH AVE Anchorage
Location:
Work Description: NOPR - Replace transfer on emergency generator - BWP 
Status: Expired
Project Name: NOPR - 401 E. 6th Ave
Review Type: Electrical
Result: Correction
Result Date: 11/30/2016 2:10:00 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:



Electrical Comments



 



Reviewed by: David Abuobaid                                                  Permit #: E16-2067



Phone: 343-8333                                                                       Date:
12/14/2016



Fax:     249-7775                                                                      



Email:  AbuobaidDH@muni.org



Permit Manager: Bob Parker



Phone: 343-8391



Email:  Parkerrw@muni.org



Project: Sheraton
Hotel (Fax: 457-4201)



____________________________________________________________________________________



 



NOTE – The following comments
are based on the fire department inspection plan review and inspection. The
previous approval was based on incomplete electrical engineering drawing. The
fire plan review comments need to be addressed.



 



1.  The
following comments based on the 2014 National Electrical Code (NEC) must be
resolved before a permit is issued. The approval of plans and specifications
does not permit the violation of any section of the NEC or any federal, state
or local regulations.



 



2. ONE LINE DIAGRAM:           



Sheet E-1.The fire plan
review \ inspection noted in their report that the existing and revised line
diagram do not match.



(a)  Provide complete line diagram for the existing
and new revised plans. The revised diagram must should show transfer switches,
fire pump(s) and their wiring be in compliance with the current NEC code.



(b)  Provide panels
schedule for the emergency and standby panels.



(c)  Provide
details wiring for the transfer switchers at the source.



(d)  The review will continue after receipt of your
response



 



3.  When
the above comments have been addressed, please update the electrical plans at
the MOA



Plans Review Office with three (3) sets of
revised electrical pages to include clouded changes, electrical engineers stamp
and signature.  



ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS