ENCLOSE BY METAL FRAMING SMALL WALLS, FINISH DRY WALL AND FRP. INSTALL ACOUSTICAL CEILING W/WASHABLE TILES, NEW STRIP LIGHTING AND OUTLET COVERS, REFRIDGE COIL UNIT TIE INTO EXISTING SYSTEM,
INSTALL VINYL STRIP DOOR, MMA FLOOR SYSTEM, TABLES, SHELVES, AND EQUIPMENT-SP.
Electrical Comments
Reviewed by: David Abuobaid Permit #: C16-2065
Phone: 343-8333 Date:11/7/2016
Fax: 249-7775
Email: AbuobaidDH@muni.org
Permit Manager: Sean Palmer
Phone: 343-8181
E Email: Palmersr@muni.org
Project: Safeway (Fax:503-699-1106)
____________________________________________________________________________________
REQUIREMENT OFELECTRICAL SCOPE OF WORK:Pleaseprovide 100% designed engineered drawing by a registered professionalelectrical engineer of the State of Alaska. The design shall include wiringmethod, home run wiring with type, size of wires and conduits, over-currentprotection, accessibility to over-current protection, existing service loadcalculations, panel schedules with connected and demand loads and one-linediagram. Refer to the attached handout No.E0.1 for Engineering Requirements.