Work to include Architectural, Structural, Fire, Electrical, Plumbing, and Mechanical.
S-1 : 18360 sqft - AJC REASSIGNED TO ANDREW 11/16/16
FINAL FIRE INSPECTION SAME DAY INSPECTION FEE PAID FOR C16-2006 UNDER THIS PERMIT - RED & GS 6/28/2019
Advisory Comment: Right of Way Permit required for all work in Municipal Rights of Way, Public Use, generic Utility, Storm Drainage, and some BLM Easements. Types of work include, but are not limited to water and sewer service connections, new driveways, drainage improvements and landscaping improvements. Only contractors with a current Right of Way Bond on file in the Right of Way Office may obtain a Right of Way Permit.
Correct all easement names to that of the plat(s) of record or recorded documents.
Correct the general notes or provide the following missing notes: