RETAIL STORE-TENANT IMPROVEMENT TO INCLUDE A, P, M, AND E.
CONTRACTOR TO PAY FOR INSPECTIONS-SP. ***5/31/19 per Aaron Kiezer w/ Famous Footwear 314-873-8921 they never moved spaces at mall so cancel this permit... no refund*** 6/4/19 slo
Reviewed by: Bergstrom, Leigh W.
Phone: 343-8326
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Sean Palmer
Phone: 343-8181
Email: PalmerSP@muni.org
Project: FAMOUS FOOTWEAR
Review Number: 381057
1) STATUS: 9-09-2016 Comments to be addressed. 10-13-2016 APPROVED.
2) The following comments based upon the 2012 International Building Code (IBC) must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC or any federal, state or local regulations. RESOLVED 10-13-2016.
3) A1.0 The construction type for the tower portion of the "Dimond Center Mall" is "!-A". Please revise. RESOLVED PER RE-SUBMITTAL RECEIVED 10-12-2016.
4) A2.0 Wall type "C" requires top of wall slip joints. Please clarify. RESOLVED PER RE-SUBMITTAL RECEIVED 10-12-2016.
5) 4/A2.0 Note #4, horizontal grab bars are to be mounted 33" to 36" AFF to the top of the gripping surface (not centerline). (ICC/ANSI A117.1-609.4.1) RESOLVED PER RE-SUBMITTAL RECEIVED 10-12-2016.
6) 3/A2.1 Structural columns within Type "I-A" construction have a required 3-hour protection. Please clarify and indicate that any damage to that protection must be repaired. RESOLVED PER RE-SUBMITTAL RECEIVED 10-12-2016.
7) 5/A5.1 Provide structural and seismic calculations plus fastening details for the overhead coiling door to include engineers stamp and signature, for structural review on a deferred submittal basis. RESOLVED PER RE-SUBMITTAL RECEIVED 10-12-2016.
8) 6/A5.1 Provide a deferred submittal for the store front glazing design/installation. RESOLVED PER RE-SUBMITTAL RECEIVED 10-12-2016.
9) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised architectural pages to include clouded changes, architects stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT. (23.10.104.8.1) RESOLVED 10-13-2016.