Permit Number: C16-1933
Permit Type: Commercial Building Permit - None BldgAlter
Address: E 800 DIMOND BLVD Anchorage
Location:
Work Description: RAISING ROOF TO MEET DAVE & BUSTERS REQUIREMENTS.  EXTENDING SOUTH 2ND FLOOR EXTERIOR WALL TO BE INLINE WITH 1ST FLOOR EXTERIOR WALL.  TO INCLUDE PLUMBING, MECHANICAL & ELECTRICAL.  47,067 SQFT - MJD
Status: Closed
Project Name: DAVE & BUSTERS
Review Type: Electrical
Result: Correction
Result Date: 9/27/2016 12:26:21 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:



Electrical Comments



 



Reviewed by: David Abuobaid                                                  Permit #: C6-1933



Phone: 343-8333                                                                       Date:
9/27/2016



Fax:     249-7775



Email:  AbuobaidDH@muni.org



Permit  Manager: Melissa Davidson Melissa Davidson     



Phone: 343-8339



Email:  davidsonmj@muni.org



Project: Dave &
Busters (Fax: 907-349-9905) 



___________________________________________________________________________________



1.  The
following comments based on the 2014 National Electrical Code (NEC) must be
resolved before a permit is issued. The approval of plans and specifications
does not permit the violation of any section of the NEC or any federal, state
or local regulations.



 



2.  EXISTING SERVICE LOAD CALCULATIONS:

Sheet E5.0. The plans have no calculations for feeder loads for the existing
building as required by NEC Section 220.87. Please address.



 



3.  CIRCUIT DIRECTORY OR CIRCUIT INDENTIFICATION
ON FLOOR PLAN & PANEL SCHEDULES:



Sheet E5.0 (Panel
Schedules and Floor Plans Circuit Identifications). Panel LS3 has two circuits
named rec.  Please note that these
circuits should be individually identified with their locations on floor plans
and on the panel schedules according to NEC 408.4 for circuit identifications.



 



4.  When the above comments have been addressed,
please update the electrical plans at the MOA Plans Review Office with three
(3) sets of revised electrical pages to include clouded changes, electrical
engineers stamp and signature.                     