432 Sq Ft Addition(5A), and renovations to the lobby and new doors through out the Hotel - BWP
**CONTRACTOR PAID FOR 30 ADDITIONAL INSPECTIONS 1/4/2017. BWP**
Reviewed by: Hellman, Becky A. Permit#: C16-1680
Phone: 343-8237 Second Review
Fax: 249-7400 Date: 8-11-16
Email: hellmanba@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: Parkerrw@muni.org
Project: AirportTravel Service Center Lot 1A – 4901 Spenard Rd. – Courtyard By MarriottExercise Room
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by theMunicipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. Special inspections are notnoted on the structural plans. Pleaselist all required special inspection items to be performed for this newconstruction per chapter 17. I.E. Concrete,post installed anchors and shear walls, etc.
8-11-16 Please provide a letter from the owner thatcalls out who will be performing the special inspections. The letter is for the file and our inspectorsto refer too.
3. See the plan set. Policy AG.39 requires that all drawings havea minimum size of 3/32”on the lettering of words. The details, schedules and such are verydifficult to read as the lettering is less than 3/32” and the copy quality waslight. Please increase the size of thelettering and make sure that the copying of the structural information is darkenough to read.
8-11-16 The sketches SSK 7-9 on sheet S2 are notmeeting the size requirement for the wording of 3/32”. Please update thedrawing to the right size.
4. 8-11-16 Resolved.
5. 8-11-16 Resolved.
6. See the shear wall plan, sheet2.
A. 8-11-16 Resolved.
B. Either on this plan, or in theholdown schedule, please include the information for the post installed anchorrequirement for the HDU4’s that are to be installed in the existing foundation;the information is buried in the calculations and need to be clearly on theplan where the information is needed for construction.
8-11-16 In the anchor design from Hilti please checkthe anchor for seismic loading to make sure that the seismic loads don’tgovern.
C. Please detail the sheartransfer from the roof diaphragm to the shear walls under in grid lines A and2. At this time there is no informationfor the shear transfer down to the shear walls of grid line A; gridline 2 mayhave a drag truss, but yet to know, plus the attachment would be needed orother solution.
8-11-16 The referenced sketch SSK-11 doesn’t depictthe load path from the upper roof diaphragm down to the shear wall in gridlineA where the trusses run over the top of the interior shear wall. Please provide this detail.
D. 8-11-16 Resolved.
7. See the typical holdown detailon sheet 8 and the holdown schedule on sheet 7. All holdowns are shown to be embedded 10” into a stem wall per thedetail on sheet 8. No calculations wereprovided for review of this 10” embedment depth in this installation asshown. Please provide the calculationsand show that ACI 318-08 appendix D D.5.2.9 has been met for the anchor and rebar has enough tensioncapacity is that length of lap.
8-11-16 Please make it clear in the sketch SSK-8 thatthe hairpin’s will be within 2 ½” from the anchor bolt to achieve the developmentlength.
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additionalinformation that is provided to address the above comments could result inadditional comments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager for this project.