432 Sq Ft Addition(5A), and renovations to the lobby and new doors through out the Hotel - BWP
**CONTRACTOR PAID FOR 30 ADDITIONAL INSPECTIONS 1/4/2017. BWP**
Structural Comments
Reviewed by: Hellman, Becky A. Permit#: C16-1680
Phone: 343-8237 First Review
Fax: 249-7400 Date: 7-19-16
Email: hellmanba@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: Parkerrw@muni.org
Project: AirportTravel Service Center Lot 1A – 4901 Spenard Rd. – Courtyard By MarriottExercise Room
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by theMunicipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. Special inspections are notnoted on the structural plans. Pleaselist all required special inspection items to be performed for this newconstruction per chapter 17. I.E.Concrete, post installed anchors and shear walls, etc.
3. See the plan set. Policy AG.39 requires that all drawings havea minimum size of 3/32”on the lettering of words. The details, schedules and such are verydifficult to read as the lettering is less than 3/32” and the copy quality waslight. Please increase the size of thelettering and make sure that the copying of the structural information is darkenough to read.
4. See the details on sheets 4 and5. It appears that the 14” lap lengthfor the vertical #5 bar in the wall with the vertical bar from the footing isnot adequate per ACI 318-08 12.2.2 or 12.2.3. Please provide an adequate lap length per this section for thesituation.
5. See the roof framing plan,sheet 3.
A. In the Architectural section1/A301, there is a flat ceiling in this space, the only structural item shownon the left side of the space is 2x12 rafters, what will the ceiling joist be?
B. I’m assuming that the trussnoted to align with the shear wall is to be a drag truss, what is the load forthe drag truss? What is the attachmentof the drag truss to the top of the shear wall for the distribution of thelateral load to the top of the wall?
C. Are the trusses to be providedas a deferred submittal? It’s not notedon the plan set nor where the truss design packet provided for review.
D. What is the roof sheathing andnailing?
E. It’s noted that there is to be blocking provided on the left side of the roof framing and (2) A35 clips at 12” o.c. There is no section for detailing this information so I’m guessing as to how this is to be actually installed in the field. I’m assuming too much, so please provide asection to demonstrate what these notes are talking about. I’m assuming that this will address, rotationof trusses and shear transfer to wall sheathing from the roof plywood.
F. The detail 1/A301 shows aparapet, the structural sheets do not address a parapet. Please provide attachments of the parapet tothe eave as shown and show shear transfer and uplift connections. This detail maybe in conflict to how the commentE above is addressed; detailing the two together would be helpful.
6. See the shear wall plan, sheet2.
A. Please make it clear in thenote that the double 2x6 stud walls will be Doug Fir-Larch #2 per thecalculations.
No sure if someone will get confused that in the drawing 10, studs arenot shown as doubled, tough required by the calculations. Please consider showing the required doublemembers to be clear on requirement in the drawing 10.
B. Either on this plan, or in theholdown schedule, please include the information for the post installed anchorrequirement for the HDU4’s that are to be installed in the existing foundation;the information is buried in the calculations and need to be clearly on theplan where the information is needed for construction.
C. Please detail the sheartransfer from the roof diaphragm to the shear walls under in grid lines A and2. At this time there is no informationfor the shear transfer down to the shear walls of grid line A; gridline 2 mayhave a drag truss, but yet to know, plus the attachment would be needed orother solution.
D. At the intersection of gridlines 1 and B, it appears that a shared holdown for the overturning will beused in this corner, please detail the load path from the chord of the HDU8holdown to the perpendicular wall of grid line 1 for sharing the uplift load.
7. See the typical holdown detailon sheet 8 and the holdown schedule on sheet 7. All holdowns are shown to be embedded 10” into a stem wall per thedetail on sheet 8. No calculations wereprovided for review of this 10” embedment depth in this installation asshown. Please provide the calculationsand show that ACI 318-08 appendix D D.5.2.9 has been met for the anchor and rebarhas enough tension capacity is that length of lap.
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additionalinformation that is provided to address the above comments could result inadditional comments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager for this project.