6/20/2016
the comment are addressed on the plans. APPROVED
Electrical Comment
Reviewed by: David Abuobaid Permit #: C16-1356
Phone: 343-8333 Date:4/26/2016
Fax: 249-7775
Email: AbuobaidDH@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: Parkerrw@muni.org
Project: Victoria’sSecret (Fax: 614-545-4555)
____________________________________________________________________________________
1. The following comments based on the 2014National Electrical Code (NEC) must be resolved before a permit is issued. Theapproval of plans and specifications does not permit the violation of anysection of the NEC or any federal, state or local regulations.
2. CIRCUIT DIRECTORY OR CIRCUIT INDENTIFICATIONON FLOOR PLAN & PANEL SCHEDULES:
Sheet E05.01 (PanelSchedules and Floor Plans Circuit Identifications). Panel schedule have manycircuits named sales area TK, Video monitor, transition rcpt. cashwrap IG, handsteamer, hand, dryer, rolling grill, etc. Please note that these circuitsshould be individually identified with their locations on floor plans and onthe panel schedules according to NEC 408.4 for circuit identifications.
3. AVAILABLE FAULT CURRENT:
Sheet E05.01 (Field Marking -Available Fault Current). Please verify that the main service has and markedwith the calculation of the available fault current. NEC Section 110.24requires that service equipment be legibly marked in the field with maximumavailable fault current. The field markings shall include the date the faultcurrent calculation was performed and be of sufficient durability to withstandthe environment impact.
4. TRANSFORMER DISCONNECTING MEANS:
Sheet E05.01 (Line Diagram –Transformer Disconnecting Mean Location). NEC Section 450.14 requires thetransformer have a disconnecting means located either in sight of thetransformer or in a remote location. When located in the remote location, thedisconnecting means shall be lockable and shall be field marked to referencethe transformer location. Please address..
5. TRANSFORMERS MOUNTING (STRUCTURAL REVIEW)
Sheet E05.01 (Transformers Structural SeismicCalculations). Provide structural, seismic calculations and fastening detailsfor the transformer including engineers stamp and signature, for structural reviewon a deferred submittal basis. Refer to Anchorage AdministrativeCode AAC 23.10.104.8.1. Please address.
6. When the above comments have been addressed,please update the electrical plans at the MOA Plans Review Office with three(3) sets of revised electrical pages to include clouded changes, electricalengineers stamp and signature.