Permit Number: C15-1161
Permit Type: Commercial Building Permit - None BldgNew
Address: 1612 ANCHORAGE PORT RD Anchorage
Location:
Work Description:

3,150 sq ft comm bldg and bulk fuel tank / tb **Master file tank farm & controls bldg**

C15-1215 780 sq ft new truck loading/fuel station bldg; C15-1216 Bulk fuel tank & retaining wall

MOA & FIRE - 1/2 size; FIELD full size

Status: Open
Project Name: POA BULK TERMINAL DELTA WESTERN
Review Type: Plumbing
Result: Approved
Result Date: 9/16/2015 8:39:00 AM

Comments:

 Code SectionReview CommentStatus
1_Resolved

Reviewed by: Bergstrom, Leigh W.                                             Permit #: C15-1161

Phone: 343-8326                                                                           Date: 9/16/2015

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Tony Barganier

Phone: 343-8339

Email: BarganierTA@muni.org

Project: POA Bulk Terminal Delta Western

Review Number: 360369

 

 

STATUS:   3-24-15 Comments to be addressed.      6-29-15 COMMENTS TO BE ADDRESSED.           9-16-15 APPROVED.

 

The following comments based upon the 2009 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.



2_Resolved

M-01 & PD-04          "At all points where fuel gas piping enters or leaves the ground, there shall be installed, above ground, an approved or listed fuel gas piping connector, capable of absorbing a six-inch displacement, in any direction, due to frost heave action." (Local amendment to IFGC 404.17)     6-29-15 UNRESOLVED. SHEET M-01 HAS NOT BEEN MODIFIED WITH THE ADDITIONAL NOTE.



3_Resolved
The installation of a medium pressure gas system (2psig or 5psig) within a building must be pre-approved by the local gas utility and shall be welded. (Local amendment to IFGC 417.0)       6-29-15 UNRESOLVED. THE PLAN SHOWS 2PSIG GAS SERVICE INTO THE BUILDING AND NOTE N3 STATES ONLY THAT GAS PRESSURES OF 5PSIG OR GREATER ARE NOT PERMITTED WITHIN A BUILDING.

4_Resolved
1/M-04 & 1/M-07           The floor drain P-traps are required to be vented per UPC 901.1.

5_Resolved
2/M-04         Specify the type of backflow preventer. (UPC 603)

6_Resolved
2/M-04         Lavatory L-1 requires an ASSE 1070 point of use mixing valve per UPC 413.1.      6-29-15 UNRESOLVED. THE PLUMBING FIXTURE SCHEDULE  ON MG-02 DID NOT INDICATE AN ASSE 1070 POINT OF USE MIXING VALVE.

7_Resolved

1/M-07        Waste lines and storm drainage piping exiting a building footprint are required to have cleanouts within 2 feet of the building exterior (UPC 1101.12.1 and local amendment to 719.1).     6-29-15 UNRESOLVED. THE CLEANOUT SCALES AT 5 FETT OUTSIDE THE BUILDING.