3,150 sq ft comm bldg and bulk fuel tank / tb **Master file tank farm & controls bldg**
C15-1215 780 sq ft new truck loading/fuel station bldg; C15-1216 Bulk fuel tank & retaining wall
MOA & FIRE - 1/2 size; FIELD full size
Reviewed by: Bergstrom, Leigh W. Permit #: C15-1161
Phone: 343-8326 Date: 6/29/2015
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Tony Barganier
Phone: 343-8339
Email: BarganierTA@muni.org
Project: POA Bulk Terminal Delta Western
Review Number: 355230
STATUS: 3-24-15 Comments to be addressed. 6-29-15 COMMENTS TO BE ADDRESSED.
The following comments based upon the 2009 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.
M-01 & PD-04 "At all points where fuel gas piping enters or leaves the ground, there shall be installed, above ground, an approved or listed fuel gas piping connector, capable of absorbing a six-inch displacement, in any direction, due to frost heave action." (Local amendment to IFGC 404.17) 6-29-15 UNRESOLVED. SHEET M-01 HAS NOT BEEN MODIFIED WITH THE ADDITIONAL NOTE.
1/M-07 Waste lines and storm drainage piping exiting a building footprint are required to have cleanouts within 2 feet of the building exterior (UPC 1101.12.1 and local amendment to 719.1). 6-29-15 UNRESOLVED. THE CLEANOUT SCALES AT 5 FETT OUTSIDE THE BUILDING.