OK for Footing & Foundation ONLY, MG 6-8-15. Other grading work outside of the building footprint such as storm drain and final grading are not approved. By the developer going forward with the F&F the floor elevation will be set prior to approval of a grading & drainage plan stamped by a civil engineer that may result in significant increased costs to the developer to resolve site specific challenges to preparing an approvable site grading & drainage plan.
Correction, MG 6-8-15.
1. Ref. C2.0; Please clarify where the swale that runs north along the west property line discharges into a drainage facility. "Proposed drainage systems shall convey drainage into an established natural watercourse or an existing storm drainage facility" DCM 2.2.D.6.
2. PDCIVIL comments may be incomplete pending further submittals.