TENANT IMPROVEMENT - TC
SHELL AND STORE FRONT C15-1149
CONTRACTOR TO PAY FOR INSPECTION FEES
Any system or method of construction to be used shall be based on a rational analysis in accordance with well-established principles of mechanics. Such analysis shall result in a system that provides a complete load path capable of transferring loads from their point of origin to the load-resisting elements.