3,150 sq ft comm bldg and bulk fuel tank / tb **Master file tank farm & controls bldg**
C15-1215 780 sq ft new truck loading/fuel station bldg; C15-1216 Bulk fuel tank & retaining wall
MOA & FIRE - 1/2 size; FIELD full size
TANK DESIGN
Reference the calculations. Please provide design of the tank for review. Reference AMC section 23.10.104.8. Please provide tank drawings for review.
TANK FOUNDATION DESIGN
Reference the tank foundation design. The design of the tank foundation does not appear to consider any lateral loads. Please provide a foundation design considering these loads. Reference ASCE 7-05 Chapter 15.
TANK ANCHORAGE DESIGN
Reference the calculations. No design for the anchorage of the tank could be located. Please provide design of the anchorage of the tank or indicate where in the submittal this design has been provided. Reference ASCE 7-05 Chapter 15.
WIND EXPOSURE
METAL BUILDING DRAWINGS AND DESIGN
Reference the drawings. It appears the control building is a premanufactured metal building. Please provide design and drawings for this building for review. Please ensure that exposure category D is used I the design. It appears that at the end of the calculations submitted that some reactions are given for a warehouse structure, but there doesn't appear to be a warehouse structure in the drawings. Do these apply to the control building? Why was no input for this model provided? It dose not appear as if any foundation design for the control building was provided. The bulk of the calculations provided appear to be for the truck rack canopy. Reference AMC section 23.10.104.8.
OIL/WATER SEPARATOR
Reference sheet C-14 of the drawings and the calculations. Please clarify where the design of the lid for the oil/water separator shown on sheet C-14 has been provided or provide the design for review. Reference AMC section 23.10.104.8.
PIPE SUPPORTS
Reference sheets P-09 through P-16 of the drawings. There appears to be some frames for pipes. Please provide design of these frames and their anchorage for review. Reference AMC section 23.10.104.8.
TRUCK RACK CANOPY
Reference page LR-03 of the drawings and the calculations. Please clarify the seismic system for the truck rack canopy. Is this a cantilever column system or an ordinary moment frame system? In either case, please provide design of all connections or indicate where in the design this has been provided.
VAPOR COMBUSTION UNIT
Reference sheet LR-6 of the drawings and the calculations. Please clarify where the design of the structural elements shown on the referenced sheet has been provided. Reference AMC section 23.10.104.8.
OTHER STRUCTURAL SCOPE
Reference sheets LR-07 and LR-08 of the drawings and the calculations. It is not clear what the foundations shown on the referenced drawings are for. Please clarify. If design of these elements have not been provided please provide (it does not appear as if design for these have been provided). Reference AMC section 23.10.104.8.
SITE CLASS
Reference sheet SG-01 of the drawings and the geotechnical report. The site class has been indicated as site class B on sheet SG-01 of the drawings; however the geotechnical report indicates site class D. Please revise the drawings to match the geotechnical report.
GENERAL INFORMATION ON DRAWINGS
For each of the structures, please provide all general design information required by IBC section 1603.
STATEMENT OF SPECIAL INSPECTIONS
Please provide a statement of special inspections as required by IBC section 1705. The statement of special inspections must include both the type and frequency of inspection.
SPECIAL INSPECTOR LETTER
Please provide a letter from the Owner indicating who they will be hiring to provide the special inspections on this project. The special inspectors must be approved by MOA in the types of inspections to be performed. Reference IBC section 1703.1.
DRAWINGS
Drawings provided must have text that is at 3/32" tall. Please provide drawings meeting this requirement. Reference MOA Policy AG.39
Reviewed by: Bolen, Wayne A. Permit #: C15-1161
Phone: 343-8072 Date: 4/13/2015
Fax: 249-7393
Email: BolenWA@muni.org
Permit Manager: Tony Barganier
Phone: 343-8339
Email: BarganierTA@muni.org
Project: MOA Bulk Terminal Tank and Control Building
Review Number: 348029
____________________________________________________________________________________
PERMIT STATUS
4/13/2015 – Review complete. Comments issued.
Advisory Comment (no response required): This review is based on the requirements of the Anchorage Administrative Code (AAC), 2009 International Building Code (IBC), 2009 International Residential Code (IRC) and all adopted references thereto as amended by MOA. The following comments must be addressed before a permit can be issued. The approval of plans and specifications does not permit the violation of the codes, or any federal, state or local regulations.
Please provide a written response to the comments and include one copy of additional or revise calculations, and two copies of additional or revise drawings.
All submittals should be sent to the permit manager.