Provide structural and seismic calculations plus fastening details for B-3 & B-4, to include engineers stamp and signature, for structural review on a deferred submittal basis. MECHANICAL APPROVED AS OF 2-06-15.
Reviewed by: Bergstrom, Leigh W. Permit #: M15-1063
Phone: 343-8326 Date: 2/06/2015
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Tommy Cornell
Phone: 343-8181
Email: CornellTA@muni.org
Project: Sheraton Hotel Boilers
Review Number: 346366
When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.