Permit Number: C14-1705
Permit Type: Commercial Building Permit - None BldgAdd
Address: 2500 MINNESOTA DR Anchorage
Location:
Work Description: ADDITION AND RENOVATION IN SUPPORT OF CAREER TECHNOLOGY CLASSROOMS AT ROMIG SCHOOL-GJS
Status: Closed
Project Name: WRCTE ADDITIONS AND RENOVATIONS
Review Type: Structural
Result: Approved
Result Date: 11/20/2014 3:07:05 PM

Comments:

 Code SectionReview CommentStatus
1_Resolved

Reviewed by: Bolen, Wayne A.                                                  Permit #: C14-1705

Phone: 343-8072                                                                        Date: 9/9/2014

Fax: 249-7393

Email: BolenWA@muni.org

Permit Manager: Tony Barganier

Phone: 343-8339

Email: BarganierTA@muni.org

Project: Romig Middle School Addition/Renovations

Review Number: 341885

____________________________________________________________________________________

 

PERMIT STATUS

9/9/2014 – F&F review complete. Comments issued.

 

Advisory Comment (no response required):  This review is based on the requirements of the Anchorage Administrative Code (AAC), 2009 International Building Code (IBC), 2009 International Residential Code (IRC) and all adopted references thereto as amended by MOA. The following comments must be addressed before a permit can be issued. The approval of plans and specifications does not permit the violation of the codes, or any federal, state or local regulations.



2_Resolved

DESIGN OF ANCHORS

Reference page 192 of the calculations. Where punching shear is checked, the capacity appears to be 196304 lbs of capacity with a Vu = 262600 lbs, but the design indicates “OK.” Please clarify. Please note that f’c on this design appears to be 3000 psi where elsewhere the strength has been taken as 4000 psi. It may be beneficial to be consistent with the concrete strengths.



3_Resolved

LATERAL AT FOUNDATION

It appears the intent from the design is to transfer the shear loads into the combined footings. Please provide substantiating data showing the footings have enough combined friction and passive pressure on them to resist the lateral loads or clarify the load path for the lateral loads into the soil. Reference ASCE -05 section 12.1.3.



4_Resolved

DRIFT

Reference the calculations. Please clarify where in the calculations drift have been checked. Please keep in mind that where the structure has a type 1a or type 1b horizontal irregularity that ASCE 7-05 section 12.12.1 must be met for drift.



5_Resolved

MOMENT FRAME CONNECTION

Reference detail 229 on sheet RS403 of the drawings. It appear that the moment connection on the pop up roof is a seismic-resisting-frame. Please verify. If it is the moment connection provided does not appear to provide the 1.1*Ry*Mp of the beam in capacity in the connection as required by AISC 341-05 section 11.2a (a full penetration weld will need to be installed with a reinforcing fillet to develop that load).



6_Resolved

DRAWING CLARIFICATIONS
Reference the drawings. Please provide the following:

 

A. Reference sheet RS202. Please provide details or reference to details for the beam to beam connection between grids R-A and R-B and grids R-D and R-E on grid R-2. Reference AISC 303-05 section 3.1.2.

B. Reference sheet RS202. Please provide details or reference to details for the beam/joist to beam connections between R-F and F-G and on grid F-2. Reference AISC 303-05 section 3.1.2.

C. Reference sheet RS202. There is a detail cut between grids R-2 and R-3 and grids R-F and R-G that references detail 213. Please verify this detail applies here (this detail does not appear to show the deck running the correct direction). Reference AAC section 23.10.104.8.

D. Reference detail 208 section C on sheet RS401. The weld connecting the tube steel to the steel beam has been indicated as a fillet weld. It appears this should be a flare bevel weld. Please clarify. Reference AAC section 23.10.104.8.

E. Reference detail 2206 sect B on sheet RS403. The weld connecting the tube steel to the steel beam has been indicated as a fillet weld. It appears this should be a flare bevel weld. Please clarify. Reference AAC section 23.10.104.8.



7_Resolved
Please provide a written response to the comments and include one copy of additional or revise calculations, and two copies of additional or revise drawings.