Permit Number: C14-1706
Permit Type: Commercial Building Permit - None BldgAlter
Address: E 800 DIMOND BLVD Anchorage
Location:
Work Description:

T.I.: FINISH OUT OF NEW RETAIL LEASE SPACE - TC

Status: Closed
Project Name: FOOT LOCKER
Review Type: Structural
Result: Approved
Result Date: 9/9/2014 10:16:26 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

PERMIT INFORMATION

Permit Number: C14-1706

Project Name: Foot Locker

Permit Manager: Tommy Cornell | ph: (907) 343-8181 | cornellta@muni.org

 

Plan Review: Mark Panilo | ph: (907) 343-8081  fax: (907) 249-7679 | panilomm@muni.org

 

Please submit all information through your Permit Manager.

 

REVIEW STATUS

08/06/2014 – Initial review (336952).  Comments issued.

 

GENERAL

This review is code compliance review based on the requirements of the International Existing Building Code (IEBC), 2009 Edition, and all adopted references thereto, as amended by the Municipality of Anchorage in Anchorage Municipal Code (AMC) Title 23.  This review does not permit the violation of the building codes, nor any federal, state, or municipal regulation.

 

The following comments must be addressed before a permit may be issued.  Additional comments may be issued following review of submitted information.

 

1. STATEMENT OF SPECIAL INSPECTIONS

Refer to Sheet S1.0.  Please provide a detailed statement of special inspections in accordance with IBC Chapter 17. This may be provided on the plans or as a separate document.

Reference: IBC Section 1705.2


2. SPECIAL INSPECTION PERSONNEL

Please provide a letter from the Owner/Owner's Representative, or Special Inspection Agency stating that the Special Inspection Agency has been retained by the Owner to provide special inspection services for the project as required by IBC Chapter 17.

Reference: AMC 23.15.1704.1.4

 

3. CLEARANCE REQUIREMENTS FOR SEISMIC DISPLACEMENT

Refer to Shelving Calculations Pg 5. Please address the following:

a. The calculations appear to base the separation on an elastic rack displacement using allowable stress methods. Please note that seismic drift is required to be based on strength-level analysis. Please provide revised analysis.

b. The calculations do not appear to address inelastic drift (deflection amplification) in determining the maximum rack displacement. Please clarify design.

c. The plans do not note the requirement for separation between the racking system and the rest of the structure. Please note the requirements on the plans.

Reference:  IBC Section 1603.1, 1613.1, 2208.1; ASCE 7 Section 12.8.6, 15.5.1, 15.5.3.4; RMI MH 16.1 Section 2.7.1

 