Approved 4/02/2014 per plans for concrete and column repair only.
.
Note: The reference to adding a fabric structure of type VB construction may not be allowed under the current codes and will require a separate submittal, review, and permit with a detailed code study. If allowed sprinkler coverage most likely is to be required to be extended into the new structure. It is recommended that the architect schedule a prelim meeting to address and discuss any issues prior to submittal.