Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: M13-1899
Permit Type: Commercial Trade Permit - New Mechanical
Address: 4000 CREDIT UNION DR Anchorage
Location:
Work Description: KITCHEN MECHANICAL UPGRADES - TC
Status: Closed
Project Name: ALASKA USA KITCHEN MECH UPGRADE
Review Type: Mechanical
Result: Approved
Result Date: 12/24/2013 11:06:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

 

Reviewed by: Bergstrom, Leigh W.                                         Permit #: M13-1899

Phone: 343-8326                                                                         Date: 12/24/2013

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Tommy Cornell

Phone: 343-8181

Email: CornellTA@muni.org

Project: Alaska USA Kitchen Mechanical Upgrades

Review Number: 324929

 

1) STATUS:   12-10-13 Comments to be addressed.     12-24-13 APPROVED.

 

2) The following comments based on the 2009 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.     RESOLVED 12-24-13. 

 

3) Provide structural, seismic and wind load calculations as applicable, plus fastening details for MAU-3 & KH-1 to include engineers stamp and signature, for structural review on a deferred submittal basis.  RESOLVED 12-24-13.

 

4) 2/M3.1           The exhaust outlet for EF-15 is to be at least 40" above the roof surface. (IMC 506.3.12.1) Please clarify.    RE-SOLVED PER RESUBMITTAL RECEIVED 12-12-13.

 

5) 4(?)/M3.1       It appears that the gas pipe distance from MAU-3 back to the branch tee is slightly more than 110' and that the total developed length for Zone 4 would be somewhat more than 110 feet. Please clarify.        RE-SOLVED PER RESUBMITTAL RECEIVED 12-12-13.

 

6) 4(?)/M3.1       It appears that the existing 1-1/4" Gas supplying MAU-3 and a future load (600 MBH @ 125') is under sized per IFGC Table 402.4(2).        RE-SOLVED PER RESUBMITTAL RECEIVED 12-12-13.

 

7) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature.             RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.          RESOLVED 12-24-13.

 

 

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS