Comm T/I: cosmetic renovation of finishes on 4th floor; ceiling grid, flooring, wall finishes; includes elec, plbg, mech / tb
7/17/2015 paid for (10) inspections
Electrical Plan Reviwed Status:
The electrial plans have been reviewed and approved.