Interior build-out of 7th floor med/surg beds, 3rd floor finish upgrades, 1250 sq ft 2nd floor electrical room add'n, 1250 sq ft parking level generator room add'n, central plant upgrades / tb
2/13/15 paid for 50 inspections; 4/10/15 paid for 33 inspections; 7/17/15 paid for 24 inspections; 9/30/15 paid for 4 inspections
Permit Status: Approved 7/19/13 slc /// Corrections pending SW approval 7/2/13 slc /// 3/14/13 slc
1. Traffic, ROW, SW and PD reviews required, permit will be routed within the department.