Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C13-1406
Permit Type: Commercial Building Permit - None BldgAlter
Address: 3401 PENLAND PKWY Anchorage
Location:
Work Description:

TENANT IMPROVEMENT (JINNY ROSE DAY)

Status: Closed
Project Name: THE ROCK WOOD FIRED PIZZA & SPIRITS
Review Type: Plumbing
Result: Correction
Result Date: 6/20/2013 3:48:00 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

 

Reviewed by: Bergstrom, Leigh W.                                               Permit #: C13-1406

Phone: 343-8326                                                                            Date: 6/20/2013

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Jinny Day

Phone: 343-8338

Email: DayJR@muni.org

Project: The Rock Wood Fired Pizza & Spirits

Review Number: 315508

 

1) STATUS:   5-24-13 Comments to be addressed.       6-20-13 UNDERGROUND PLUMBING ONLY APPROVED. COMMENTS TO BE ADDRESSED.               

 

2) The following comments based upon the 2009 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.        RESOLVED 6-20-13.

 

3) P-100            Concerning the existing grease trap (note #8): Where is the existing flow control fitting and vent piping (UPC 1014.2.1) and where does the outlet connect to the sanitary waste main?      RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

4) P-100            The P-trap for the 3" FS-1 in the middle of the bar area requires vent piping. (UPC 901.1)         RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

5) P-100            The water heater enclosure for HWH-1 requires a floor drain per local amendment to UPC 508.4.         RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

6) P-100            The waste piping from the two new 3" FS-1's serving the soda guns (V1) and the beer tower (V3) and the existing floor sink serving the soda dispenser (V4) will not be compatible with the disposed waste byproducts if the contractor chooses to use cast iron pipe and fittings. Please clarify.         RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

7) P-101            The high efficiency water heaters (HWH-1) are required to have the exhaust condensate processed through a condensate neutralizer. (local amendment to IFGC 307.2)              RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

8) P-101            Provide a water heater installation schematic diagram providing details for gas piping, venting, condensate piping, domestic HW & CW piping, HWC piping, expansion tank, circ. pump (P-1), etc.         RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

9) P-101            Notes #9 and #10 to specify the mixing valve as TMV-1 to meet the requirements of UPC 413.1.                  RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

10) P-101          HWH-1 requires seismic bracing per UPC 508.2. Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

11) P-101          P-1 @ 5.5 GPM, pumping domestic hot water through the existing 1/2" copper HWC line provides a velocity of approximately 8FPS. UPC 610.12.1 allows a maximum of only 5 FPS. Please address.        RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

12) P-400          The custom trough sink being provided by owner will be required to have a third party listing by a recognized agency. Provide manufacturer's submittal literature on this item.          6-20-13 UNRESOLVED. SUBMITTAL LITERATURE HAS NOT BEEN PROVIDED BY THE ARCHITECT.

 

13) 6/P-401       The 3-compartment sink requires a direct connection (UPC 704.3), a center waste outlet (UPC 1001.2) with vented P-trap (1014.1.1) and a vented flow control fitting (UPC 1014.2.1) prior to entering the grease trap.             RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.                           

 

14) K-2             The under bar 3-compartment sink (B13) requires a center waste outlet (UPC 1001.2). Please clarify.              RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

15) K2              The 3-compartment sink (#29) requires a direct connect to the sanitary waste.             RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.       

 

16) M-100 & M-300          Note #21 on M-100 refers to hood #KH-2 as a condensate hood and the detail on M-300 shows a full perimeter gutter drain. Please address the perimeter drain piping.          RESOLVED PER RESUBMITTAL RECEIVED 6-17-13.              

 

17) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised plumbing pages to include clouded changes, engineers stamp and signature.                       RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.

   

 

  

 

 

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS