1. AG 21 checklist 2 and 3 provided. Draft SWPPP provided.
2. Provide NOI and completed SWPPP prior to permit issuance. Provided 5/20/13 PL
3. Provide operations and maintenance manual for the site. (specifically testing and evaluation regimen for the infitration trenches. A monitoring tube may be advisable.) Comment By S.Ellis
4. Povide a storm drain as-built certified by a PE prior to final certificate of occupancy.By Steve Ellis. See Plan set By PL 5/21/13