TENANT IMPROVEMENT (JINNY ROSE DAY)
Reviewed by: Bergstrom, Leigh W. Permit #: C13-1406
Phone: 343-8326 Date: 5/24/2013
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Jinny Day
Phone: 343-8338
Email: DayJR@muni.org
Project: The Rock Wood Fired Pizza & Spirits
Review Number: 313329
1) STATUS: 5-24-13 Comments to be addressed.
2) The following comments based on the 2009 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.
3) Provide structural, seismic and wind load calculations as applicable, plus fastening details for RTU-1 thru 4, KMUA-1 and KH-1 & 2 to include engineers stamp and signature, for structural review on a deferred submittal basis.
4) M-100 Dishwasher V-2 requires a Type II vent hood. Dishwasher literature was not provided in the kitchen equipment submittal package. (IMC 507.2.2)
5) M-100 The pizza oven exhaust duct requires a cleanout for the horizontal portion. (IMC 506.3.9) Please clarify.
6) M-100 The left hand side of Notes #13 thru #15 did not print clearly and are unreadable.
7) M-100 Hood #KH-2 is depicted a Type II hood while on M-300 it allows for a maximum cooking temperature of 100 degrees above that of the Type I hood #KH-1. Also, IMC 202 qualifies the appliance beneath as a Medium-Duty Cooking Appliance with a gas open burner range (at 200 MBH) which requires a Type I hood per IMC 507.2.1. Please clarify.
8) M100 Note #21 refers to the Schedule on M-400 which is actually on M-300.
9) M-100 Note #22 at the Fire Pit refers to EF-4 above on the roof. However, EF-4 is the exhaust fan for the pizza oven. Please clarify.
10) M101 EF-5 note #1 refers to the equipment schedule on M301, but there is no detail for the fan and curb as there is for the other exhaust fans. Please clarify.
11) M-101 It appears that 42" guards are required at the roof edge for EF-1, 2, 3 & 5, RTU-2 &4, KMUA-1 and the existing roof hatch. (IMC 304.11)
12) M-300 The building is classified as Type "V-B" construction which allows wood framed walls. Please clarify the required 18" clearance from combustible construction from KH-1 required per IMC 507.9.
13) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.