Permit Status: Approved 4/26/13 slc /// Corrections 4/26/13 slc
1. Please provide information about the changeable copy timing of the sign. See statement by Dave Mabeus on plans 4/26/13 slc
2. Please provide calculations to show that the changeable copy portion of the sign is less than 50% of the overall sign area. /// calcs provided. 4/26/13 slc
NOTE TO REVIEWER: Change is allowed in the direction of conformity - see policy from Jack Frost in file