Reviewed by: Bergstrom, Leigh W. Permit #: C12-1227
Phone: 343-8326 Date: 1/17/2013
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Jinny Day
Phone: 343-8338
Email: DayJR@muni.org
Project: UAA SPORTS ARENA
Review Number: 308382
1) STATUS: 4-19-12 Comments to be addressed. 5-25-12 COMMENTS TO BE ADDRESSED. 10-24-12 COMMENTS TO BE ADDRESSED. 1-17-13 COMMENTS TO BE ADDRESSED.
2) The following comments based on the 2009 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations. RESOLVED 10-22-12.
3) M052 Provide a letter of approval from the Alaska State Department of Environmental Conservation for the use of well water cooling and reinjection. 10-22-12 UNRESOLVED. THIS ITEM WAS NOT ADDRESSED. 1-17-13 UNRESOLVED. AWAITING RESPONSE FROM THE STATE DEC.
4) M402 thru M446 and M701 thru M704 A standard sheet note states: "Provide fire-caulking to fill annular space around duct penetrations through floor assemblies." IBC 716.6.1 requires a fire damper for duct penetrations of only one floor assembly and a shaft is required when a duct penetrates more than one floor assembly per IBC 708.2. The standard sheet note is therefore incorrect. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
5) M402 & M704 The 4 ducts going up to AHU-4 require fire/smoke dampers where they enter and exit a rated shaft enclosure required per IBC 708.2. Detail 7/A035 is incorrectly shown. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
6) M406 The two 2-Hour rated elevator machine rooms #B1110 & #B1020 each have four wall penetrations that require fire dampers. (IBC 716.5.2) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
7) M406 & M416 The 12" exhaust duct transitioning from Ski Storage B1015 up thru the floor/ceiling assembly to Receiving 1005 requires a fire damper at the floor penetration. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
8) M411 Clarify where the 120" x 54" R/A UP goes to. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
9) M412 The reference to detail 4/M722 could not be found. Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
10) M412 The 20" FD should be located at the floor/ceiling penetration. The wall around the Women's Toilet #1300 is not rated. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
11) M412 The 28 SF R/A opening requires a fire damper at the rated floor/ceiling penetration. (IBC 716.5.2) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
12) M412 The 24" x 48" SA UP (AHU-7) requires a fire damper at the rated floor/ceiling assembly. (IBC 716.5.2) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
13) M415 & 1/M601 There is a space on the Boiler Room wall adjacent to the bathrooms dedicated for electrical and controls. All ducting passing through this space must be at least 6 feet above the equipment below it per NEC 110.26(F)(1)(a). Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
14) M416 With reference to sheet note #3, the field applied grease duct enclosure for this project is required to be rated for two hours (IMC506.3.10). Provide more clarification on the plans. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
15) M416, M435 & 1/A035 The 20x40 F.O. from AHU-1 transitioning from the balcony level to the first floor must be located within a 2-Hour rated shaft with FSD's at the upper and lower shaft penetrations. (IBC 708.2 & 716.5.3) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
16) M416 & M426 The 10" exhaust duct transitioning from Assistant Coach 1127 up thru the floor/ceiling assembly to Storage 2115 requires a fire damper at the floor penetration. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
17) M421 & M702 The four floor/ceiling penetrations up to Fan Room 3030 require fire dampers per IBC 716.6.1. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
18) M422 & M703 The 20" EA up through the floor/ceiling assembly to EF-7 in Mechanical 3025 requires a fire damper per IBC 716.6.1. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
19) M426 & M446 The 12" exhaust duct transitioning from Storage 2115 up thru the floor/ceiling assembly to mezzanine bathrooms requires a fire damper at the floor penetration. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
20) M446 With reference to sheet note #8, the access door appears to be located in a 2-Hour wall assembly and requires a fire rated access door. Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
21) 1/M611 Condensate from the high efficiency boilers is required to be processed through a condensate neutralizer (local amendment to IFGC 307.2). RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
22) M701 The ducts coming up through the floor to EF-2 & EF-3 require fire dampers. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
23) M702 If RAS 5 and RAS 6 penetrate the floor, they require fire dampers at the penetrations. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
24) M703 If RAS 7 penetrates the floor, it requires a fire damper at the penetration. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
25) M703 The shaft enclosure around the two 16" dryer exhaust ducts between column lines "F" & "G" is required to be continuous around the ducts up to the roof deck. (IBC 708.12) Clarify and coordinate with architectural. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
26) M704 The three wall penetrations along column line "K.5"appear to be through a 2-Hour wall assembly and require fire dampers. (IBC 716.5.2) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
27) M711 IBC 716.6.1 requires a fire damper for duct penetrations of only one floor assembly and a shaft with fire smoke dampers is required when a duct penetrates more than one floor assembly per IBC 708.2. Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
28) M713 Duct penetrations through the floor from AHU-1 require fire dampers. (IBC 716.6.1) RESOLVED PER RESUBMITTAL RECEIVED 1-11-13.
29) Provide structural, seismic and wind load calculations as applicable, plus fastening details for ACC-1, AHU-1 thru 10, AS-1 & 2, BLR-1 thru 4, CH-1 & 2, D-1& 2, DC-1 & 2, ET-C1 & 2, ET-H1 & 2, HDE-8 thru 11, HX-1 thru 5, GM-1 thru 3, GM-C1 & 2, MAU-1, RF-3, W-1 & 2, WH-1 thru 3, PMP-H1 thru H3 and the Overhead Coiling Fire Doors at the concession stands to include engineers stamp and signature, for structural review on a deferred submittal basis. RESOLVED 1-17-13.
30) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature.