Reviewed by: Crafts, Donald E. Permit #: C12-1227
Phone: 343-8451 Date: 10/24/2012, 01/30/2013, 02/06/13
Fax: 249-7652
Email: CraftsDE@muni.org
Permit Manager: Jinny Day
Phone: 343-8338
Email: DayJR@muni.org
Project: UAA SPORTS ARENA
Review Number: 308380
1. Status: Architectural Corrections required. Status: Footing and Foundation Architectural Approval. Please resolve comments and provide complete submittal for Shell and Core Construction Architectural review. 4/21/12 Status: Full Architectural Approval. 9/10/12
Status: Full Architectural Approval for conformed set of drawings. 2/06/13
2. The following comments based on the 2009 (revised to 2006) International Building Code (IBC) must be resolved before a permit is issued. The plans and specifications do not permit the violation of any section of the IBC or any federal, state, or local regulations. 9/06/12
3. Drawing A020, Code Review, Revise: International Building Code (IBC) 2006 Edition, to: International Building Code (IBC) 2009 Edition. The following codes are applicable to this project:
International Building Code (IBC) 2009
International Fire Code (IFC) 2009
International Mechanical Code (IMC) 2009
International Fuel Gas Code (IFGC) 2009
International Energy Conservation Code (IECC) 2006
Uniform Plumbing Code (UPC) 2009
National Electric Code (ICC/NEC/NFPA 70) 2008
Accessible and Useable Buildings and Facilities (ICC/ANSI A117.1) 2003
4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
4. Drawing A020, Code Review, Balcony Walkway Mezzanine, Revise: 3,870 SF OK Since <50%, to: 3,870 SF OK Since <50% per 505.2, exception 2. The requirements of this exception include Sprinklers (which is already noted in the code study in accordance with 903.3.1.1) and Emergency Voice/Alarm Communication System (which needs to be noted in the code study in accordance with 907.5.2.2). 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
5. Drawing A020, Code Review, Heavy Timber, Revise: 603.1, exception 16, to: 603.1, exception 18. 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
6. Drawing A020, Code Review, Incidental Use, Revise: 508.2, to: 508.2.5. 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
7. Drawing A020, Code Review, Shaft Enclosures, Revise: 707.4, to: 708.4. 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
8. Drawing A020, Code Review, Shaft Enclosures (Elevator), Revise: 707.14, to: 708.14. 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
9. Drawing A020, Code Review, Vertical Exit Enclosures, Revise: 1020.1, to: 1022.1. 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
10. Drawing A020, Code Review, Dead End Corridor, Revise: 1017.3, to: 1018.4. 4/19/12 Resolved. Per an earlier agreement dated 7/18/11, utilizing the 2006 IBC is acceptable. No change required. 9/06/12
11. Drawing A020, Code Review, Travel Distance Requirements, With Sprinkler (Table 1016.1), Revise: 300 Ft Max, to: 300 Ft Max (Except 250 Ft Max for A-3 and A-4 areas). 4/19/12 Resolved. 250 Ft Max in 'A' occupancies has been added. 9/06/12
12. Drawing A020, Code Review, Travel Distance Requirements, Common path of Travel (with sprinklers), Revise: 100 Ft Max, to: 1014.3, exception 1, 100 Ft Max (Except 75 Ft Max for A-3 and A-4 areas). 4/19/12 Resolved. 75 Ft Max in 'A' occupancies and 30 Ft Max in 'A' seating areas has been added. 9/06/12
13. Drawing A(all), All Architectural Sheets, The submitted architectural plans and code study are not sealed and signed by an Alaska licensed architect. Please provide an architectural plans and code study sealed and signed by an Alaska licensed architect. 4/19/12 Tentatively Resolved. All drawings and the code study will be sealed and signed by an Alaska licensed architect in the final submittal. 9/06/12 Resolved. All drawings and the code study have been sealed and signed by an Alaska licensed architect in the latest submittal. 9/10/12
14. Drawing A020, . 4/19/12 Resolved. 9/06/12
15. A021 THRU A023 & 7/A035 NEW 10/24/12 AHU-4 DUCTS FROM THE BASEMENT UP TO THE BALCONY ARE REQUIRED TO BE ENCLOSED WITHIN A RATED SHAFT WITH FIRE/SMOKE DAMPERS AT THE UPPER AND LOWER SHAFT PENETRATIONS. (IBC 708.2, 716.5.3 & 716.6) Resolved. 2/06/13
16. 1/A035, & A021 THRU A023 NEW 10/24/12 THE DUCT FROM AHU-1 FROM THE BASEMENT UP TO THE BALCONY IS REQUIRED TO BE ENCLOSED WITHIN A RATED SHAFT WITH FIRE/SMOKE DAMPERS AT THE UPPER AND LOWER SHAFT PENETRATIONS. (IBC 708.2, 716.5.3 & 716.6) Resolved. 2/06/13
17. 2/A035 NEW 10/24/12 THE DUCT IS NOT PENETRATING A SHAFT AND THEREFORE REQUIRES ONLT A FIRE DAMPER. (IBC 716.5.2) Resolved. 2/06/13
18. 5/A035 NEW 10/24/12 FOUR DIFFERENT NOTES ON THIS DETAIL HAVE BEEN BLANKED OUT AND ARE UNREADABLE. PLEASE CLARIFY. Resolved. 2/06/13
19. 8/A035 NEW 10/24/12 DUCT PENETRATIONS THROUGH ONE FLOOR/CEILING ASSEMBLY REQUIRE FIRE DAMPERS. (IBC 716.6.1) Resolved. 2/06/13