Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: X12-2074
Permit Type: Commercial Building Permit - ChangeOrdr BldgNew
Address: N 1074 MULDOON RD Anchorage
Location:
Work Description: Addendum #2 & CCD#1 / tb
Status: Closed
Project Name: Change Order of Bldg App C12-1324
Review Type: Architectural
Result: Approved
Result Date: 1/11/2013 4:46:00 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

 

Reviewed by: Crafts, Donald E.                                                  Permit #: C12-1324; X12-2074

Phone: 343-8451                                                                        Date: 12/26/2012; 01/11/13

Fax: 249-7652

Email: CraftsDE@muni.org

Permit Manager: Tony Barganier

Phone: 343-8339

Email: BarganierT@muni.org

Project: SAM'S CLUB 6602 - 1074 N MULDOON RD

Review Number: 308242

 

1.  Status: Architectural Corrections required for this Change Order.  12/26/12   Status: Full Architectural Approval.  As stated below, note: any additional changes to the exterior walls due to structural considerations will have to be back fitted into this analysis for further energy conservation review.  01/11/13

 

2.  The following comments based on the 2009 International Building Code (IBC) must be resolved before a permit is issued.  The plans and specifications do not permit the violation of any section of the IBC or any federal, state, or local regulations.

 

3.  Please provide assurance that the Building Envelope meets or exceeds the Energy Efficiency requirements of IBC Section 1301.1 and The International Energy Conservation Code (IECC) Chapter 5 and Local Amendments to IECC Chapter 5 requirements.  Show compliance with the requirements of Climate Zone 7 in IECC Table 502.2(1) and 502.2(3) as well as the Local Amendment to IECC Table 502.2(1) on unheated slabs.  Note that the Metal Stud Framing with R-19 insulation between the studs produces an R value that is approximately 8.  Is there a roof assembly indicated in the plans?  The door schedule indicates hollow metal for exterior doors.  Are these intended to be insulated hollow metal for exterior doors?  Has there been an energy analysis submitted for review?  12/26/12    Resolved.   Note: any additional changes to the exterior walls due to structural considerations will have to be back fitted into this analysis for further energy conservation review.  01/11/13

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS