1. Complete an AG 21 Checklist #2. Provide the required documentation for a project with this area of disturbance; SWPPP type 2, Operations and Maintenance Manual, etc... RESOLVED SME 6-20-12.
2. SWPPP and NOI provided. AKR10EC54. sme 6-18-12.
3. OK for grading and excavation not to exceed 5 feet in depth. No excavation dewatering or ultility work allowed. sme 6-18-12. RESOLVED SME 6-20-12.
4. Complete AG 21 checklists 2 and 3. RESOLVED SME 6-20-12.
5. Provide ESC plan. RESOLVED SME 6-20-12.
6. Provide a dewatering plan. Ground water will be pumped into a tanker and hauled to a legal disposal location (AWWU). RESOLVED SME 6-20-12.
7. Provide an Operations and Maintenance Manual.
8. Show permanent storm water treatment.
9. Complete the corrections for items 4 and 5 by June 20, 2011 or a stop work order may be posted. sme 6-18-12. RESOLVED SME 6-20-12.
10. OK for Shell Permit. sme 6-20-12.