Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C12-1795
Permit Type: Commercial Building Permit - None BldgAlter
Address: 2801 DEBARR RD Anchorage
Location:
Work Description: Structural repair of a pedestrian bridge on the Alaska Regional Hospital Campus; includes elec,mech / tb
Status: Issued
Project Name: ARH/VA PEDESTRIAN BRIDGE REPAIRS
Review Type: Structural
Result: Correction
Result Date: 6/14/2012 4:37:39 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

Reviewed by: Bolen, Wayne A.                                                  Permit #: C12-1795

Phone: 343-8072                                                                        Date: 6/14/2012

Fax: 249-7393

Email: BolenWA@muni.org

Permit Manager: Tony Barganier

Phone: 343-8339

Email: BarganierTA@muni.org

Project: ARH/VA Pedestrian Bridge Repair

Review Number: 293444

____________________________________________________________________________________

 

PERMIT STATUS

6/14/2012 – Permit reviewed. Comments issued.

 

Advisory Comment (no response required):  This review is based on the requirements of the Anchorage Administrative Code (AAC), 2009 International Building Code (IBC), 2009 International Residential Code (IRC) and all adopted references thereto as amended by MOA. The following comments must be addressed before a permit can be issued. The approval of plans and specifications does not permit the violation of the codes, or any federal, state or local regulations.

 

1. SPECIAL INSPECTORS

Please provide a letter from the Owner indicating who will be providing special inspection services for this project. The special inspector(s) must be licensed by MOA in the type(s) of inspection(s) to be performed.

 

2. DRAWING CLARIFICATIONS

Reference the drawings. Please provide the following:

 

A. Reference detail 1 on sheet S4.1. Flare bevel welds do not have throat sizes indicated. Please remove the size.

B. Reference detail 2 on sheet S4.1. Please clarify the weld call out for the plate to column connection. The weld shown in the elevation does not appear to match the one in section.

 

Please provide a written response to the comments and include one copy of additional or revise calculations, and two copies of additional or revise drawings. While not required it is extremely helpful to the reviewer if the response indicates where in the submittal each comments has been addressed.

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS