1. Complete an AG 21 Checklist 2 and 3. Provide the required documentation for project with this area of disturbance.
2. SWPPP has been provided.
3. Prior to a fianl CO provide a digital copy of the SPCC plan.
4. Determine with ADEC if a SWPPP is required under the Multi-Sector General Permit for Industrial Activities for this site.
5. Provide sizing data and flow rates for the Oil and Water Separator.