Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C12-1269
Permit Type: Commercial Building Permit - None BldgNew
Address: N 1142 MULDOON RD Anchorage
Location:
Work Description:

CORE AND SHELL ONLY:  17,383 SQ FT (M) JINNY ROSE DAY)

 

NOTE:  FILL/GRADE MASTER # 07-5165

Status: Closed
Project Name: TIKAHTNU COMMONS MALL BLDG F
Review Type: Structural
Result: Correction
Result Date: 4/4/2012 2:11:02 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

PERMIT INFORMATION

Permit Number: C12-1269

Project Name: Tikahtnu Commons Bldg. F

Permit Manager: Jinny Rose Day | ph: (907) 343-8338 | dayjr@muni.org

 

Plan Review: Mark Panilo | ph: (907) 343-8081  fax: (907) 249-7679 | panilomm@muni.org

 

Please submit all information through your Permit Manager.

 

REVIEW STATUS

04/04/2012 – Initial review (289585).  Comments issued. Wind and seismic review halted.

 

GENERAL

This review is code compliance review based on the requirements of the International Building Code (IBC), 2009 Edition, and all adopted references thereto, as amended by the Municipality of Anchorage in Anchorage Municipal Code (AMC) Title 23.  This review does not permit the violation of the building codes, nor any federal, state, or municipal regulation.

 

The following comments must be addressed before a permit may be issued.

 

1. OCCUPANCY CATEGORY

Refer to Sheets G020, S101.  The architectural plans note the occupancy based on non-separated use, with Group A-2 occupancy as the governing type.  The calculated occupant load is greater than 300 and qualifies as an Occupancy Category III structure.  The structural design assumes Occupancy Category II.  Given the increase in importance factor from Category II to III, a revised structural analysis is required to address the suitability of the proposed design.

 

Unless the architectural code study is updated to specifically denote that the primary occupancy is not Group A, no further review of the wind and seismic design can be done until such time as the revised analysis is provided.

Reference: IBC Section 508.3, 1004.1, 1604.5

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS