Advisory Comment: Right of Way Permit required for all work in Municipal Rights of Way, Public Use, generic Utility, and some BLM Easements. Types of work include, but are not limited to water and sewer service connections, new driveways, drainage improvements and landscaping improvements. Only contractors with a current Right of Way Bond on file in the Right of Way Office may obtain a Right of Way Permit.
Show property lines on all plan views so we may determine Right of Way Permitting areas.
Please research and clarify why some of Elmore Road is shown as an easememt where the plat(s) of record indicate dedicated right of way.
Correct the designation of the arena parking lots from "East" to "West".
Show all existing roads, indicating type and road surface material, driveways, presence and type of curb and gutter, trails, and sidewalks.
Show all existing drainage facilities with pipe sizes, structures, rim and invert elevations.
Some of the proposed storm drainage system has less than 4' of cover or so close, the potential for freezing is increased. Provide insulation board or additional cover for all areas with less than 4' of cover. Also for the same freezing potential, the MOA does not advise, and strongle discourages the connection to the back of a catch basin. In most cases the connection has to be to the street manhole or repace the catch basin with a CBMH and replace the lead to gain the additional cover.
Show new driveway(s) entry details.
Right of Way Permit required for all work in the Providence Drive and Elmore Road rights of way; Utility Easements, Public Use Easements, and Drainage Easements.