The scope of this CO is:
(1) The new location of the new generator that is over 50 ft from the building.
The request was submitted thrugh Alternate means and method and submitted through a change order. The alternate means and method was reviwed and approved.
(2) The other changes is in X11-1804. It is the change of the transformer size, change of MDP rating, and change of load. Refer to chage order X11-1804.