Permit Status: Approved 10/17/11 slc /// Corrections 9/29/11///9/11/11 slc /// 8/1/11 slc
1. SW, PD and TR reviews required, permit will be routed within the department.///see folder for approvals for PD,TR. Waiting for SW.
2. Please show the location of the proposed tank on a plot plan by a registered State of Alaska land surveyor. Survey provided does not show the proposed tank. /// see new survey submitted 9/8, proposed tank and retaining wall shown. 9/9/11 slc
3. Provide a stamped and signed approved site plan from Community Planning for an amendment to the existing conditional use. /// see email from Jerry Weaver in file, this is a minor amendment to an existing conditional use and the building permit is ok. 8/11/11 slc
4. Zoning review incomplete pending receipt of requested information. Additional comments may result from information received.