Permit Status: Corrections 8/11/11 slc /// 8/1/11 slc
1. SW, PD and TR reviews required, permit will be routed within the department.
2. Please show the location of the proposed tank on a plot plan by a registered State of Alaska land surveyor. Survey provided does not show the proposed tank.
3. Provide a stamped and signed approved site plan from Community Planning for an amendment to the existing conditional use. /// see email from Jerry Weaver in file, this is a minor amendment to an existing conditional use and the building permit is ok. 8/11/11 slc
4. Zoning review incomplete pending receipt of requested information. Additional comments may result from information received.