Reviewed by: Bolen, Wayne A. Permit #: C11-1660
Phone: 343-8072 Date: 8/19/2011
Fax: 249-7393
Email: BolenWA@muni.org
Permit Manager: Jinny Day
Phone: 343-8338
Email: DayJR@muni.org
Project: QTF De-Icer Tank
Review Number: 280504
____________________________________________________________________________________
PERMIT STATUS (no response required) 8/19/2011: Review completed. Comments issued.
Advisory Comment (no response required): This review is based on the requirements of the Anchorage Administrative Code (AAC), 2009 International Building Code (IBC) and all adopted references thereto as amended by MOA. The following comments must be addressed before a permit can be issued. The approval of plans and specifications does not permit the violation of the codes, or any federal, state or local regulations.
1. FOUNDATION DESIGN
Please provide the foundation design as well as the calculations showing how the reactions used to design the foundation were determined for review. Reference ASCE 7-05 section 15.7 and AAC section 23.10.104.8.
Please provide a written response to the comments and include one copy of additional or revise calculations, and two copies of additional or revise drawings. While not required it is extremely helpful to the reviewer if the response indicates where in the submittal each comments has been addressed.
All submittals should be sent to the permit manager.