Advisory Comment: Right of Way Permit required for all work in Municipal Rights of Way, Public Use, generic Utility, and some BLM Easements. Types of work include, but are not limited to water and sewer service connections, new driveways, drainage improvements and landscaping improvements. Only contractors with a current Right of Way Bond on file in the Right of Way Office may obtain a Right of Way Permit.
This road was just constructed and there is no reasonable justification for tearing it up without verifying with PME the B Street Street and Storm record drawings as to storm stub outs to the west lots. The stub out requirement was in the ROW plan review comments for the PME project and they should have been provided. (7-18-2011, lmm)
Verify Show proposed on-site snow storage or provide a note for hauling to a snow dump. (7-18-2011, lmm)
Sheet C-2.0; correct or finish the "Detailed Grading Plan". (7-18-2011, lmm)
Show in the legend the W/HB for the irrigation lines. (7-18-2011, lmm)
Right of Way Permit required for all work in the B Street right of way. ROW approved for fill and grading only as a submittal of drainage redesign is forthcoming. (7-18-2011, lmm) There is still a major difference in elevations between the Enterprise design and the MOA redlines for the existing storm stub out at the North East corner of the parcel. (7-22-2011, lmm)