Permit Status: Corrections 7/27/11 slc
1. This permit will include comments for both Lot 2 and Lot 1. See permit C11-1586.
2. A total of five parking spaces are required for this site, three parking spaces are required for the structure on lot 2, two spaces are required for the structure on lot 1. Only four spaces total are shown, please address. Traffic review is required for reconfigured parking areas, permit will be routed within the department. Pay Traffic review fee.
3. Snow storage space equal to 15% of the total area used for parking, access drives, walkways, etc. is required per AMC 21.45.310.M. Please show snow storage area on site plan.
4. Provide a copy of the non-conforming determination for the lack of required visual enhancement and buffer landscaping.
5. Please designate the required 15% open space on the site plan, see AMC 21.45.310.D.
6. Zoning review is incomplete pending receipt of the non-conforming determination and requested information. The results of the non-conforming determination may result in additional comments and requirements.