1) STATUS: 6-9-11 Mechanical plans require the signature of the engineer of record. 6-23-11 Provide structural, seismic and wind load calculations plus fastening details for RTU-1, 7 & 8 to include engineers stamp and signature, for structural review on a deferred submittal basis. MECHANICAL APPROVED AS OF 6-23-11.