1) STATUS: 3-30-11 Comments to be addressed. 4-25-11 APPROVED.
2) The following comments based on the 2006 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations. RESOLVED 4-25-11.
3) Provide structural, seismic and wind load calculations as applicable plus fastening details for B-1 thru 4, WH-1 & 2 and T-1 to include engineers stamp and signature, for structural review on a deferred submittal basis. RESOLVED 4-25-11.
4) Provide a complete gas piping schematic to include all appliance input loads, pipe distances and pipe sizes such that verification of compliance with UPC Table 12-8 may be verified. RESOLVED PER RESUBMITTAL RECEIVED 4-22-11.
5) 2/M9 WH-1 has a 2" G supply and WH-2 has a 1-1/2" G (TYP). Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 4-22-11.
6) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised mechanical plans to include clouded changes, engineers stamp and signature. RESOLVED 4-25-11.