Provide structural, seismic and wind load calculations as applicable plus fastening details for the walk in cooler condensers, MAU-1, HOOD #1 & #2 and RTU-1 to include engineers stamp and signature, for structural review on a deferred submittal basis. MECHANICAL APPROVED AS OF 4-13-11.