1) Provide structural, seismic and wind load calculations as applicable plus fastening details for COND-1 thru 4 and AHU-1 thru 3 to include engineers stamp and signature, for structural review on a deferred submittal basis. MECHANICAL IS APPROVED AS OF 4-14-11.