Accessibility upgrades to toilet rooms and other misc elements including sitework-gjs
2/3/2014 permit canceled per Charles Starr / tb
5/20/2011
The engineer has provided clarification on this small TI at Alaska Regional. Approved
REQUIREMENT OF ELECTRICAL SCOPE OF WORK:Sheet E209a is designed by a registered professional electrical engineer of the State of Alaska. The design shall include existing service load calculations, panel schedules with connected and NEC demand loads, wiring method, and one-line diagram. Please note that the patient care areas must comply with NEC section 517.13. Please indicate if any of the loads connected to the emergency generator system .