PERMIT STATUS
04/11/2011 – X11-1025 - Initial review (272035). Comments issued.
5/18/2011 - Anchorage of MUA approved. Water heater has not been approved.
CONSTRUCTION REQUIRING SPECIAL INSPECTION
Please clarify the attachment method for the water heater. The structural design notes two methods: lag screw and post-installed masonry anchors. Please note that masonry anchors are subject to special inspection requirements of IBC Chapter 17.
Reference: AMC 23.10.104.8.1; ICC-ES ESR-1385 Section 4.3
The following is required if post-installed masonry anchors are used:
SPECIAL INSPECTION PERSONNEL
Please provide a letter from the Owner/Owner's Representative, or Special Inspection Agency stating that the Special Inspection Agency has been retained by the Owner to provide special inspection services for the project as required by IBC Chapter 17.