PERMIT STATUS3/15/2011 - Permit reviewed. Comments issued.
1) Please provide the design of the bleachers per ICC300 or provide a letter from the manufacturer indicating the bleachers have been designed or tested per the requirements of the referenced document. Letter must be sealed by an engineer licensed in Alaska. If design is provided the drawings must be sealed by an engineer licensed in Alaska. Reference IBC Table 1607.1, Note c. and the Alaska State Statutes section 08.48.221.