1) STATUS: 2-18-11 Comments to be addressed.
2) The following comments based on the 2006 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.
3) Provide structural, seismic and wind load calculations as applicable plus fastening details for WH-1, MAU-1 and the two kitchen hoods to include engineers stamp and signature, for structural review on a deferred submittal basis.
4) 4/M3.0 The lower combustion air opening into the room is more than 12" AFF. (IFGC 304.6.1)
5) 4/M3.0 The upper horizontal combustion air duct shall not slope downward toward the source of combustion air. (IFGC 304.11.6)
6) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised mechanical plans to include clouded changes, engineers stamp and signature.