Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: 09 5120
Permit Type: Commercial Building Permit - None BldgNew
Address: 6250 SOUTH AIRPARK PL Anchorage
Location: 6250 SOUTH AIRPARK PLACE
Work Description: Work Descr: 19873 sqft-B, 21,137 sqft S1, Remarks: JRD
Status: Closed
Project Name: NORTHERN HOLDINGS
Review Type: Plumbing
Result: Approved
Result Date: 7/15/2010 12:00:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

. STATUS: 1-12-10 Comments to be addressed. 7-17-10 APPROVED. The following comments based on the 2006 Uniform Plumbing Code must be resolved before a permit is issued. Theapproval of plans and specifications does not permit the violation of any section of the Uniform plumbing Code or any federal, state or local regulations. RESOLVED 7-15-10. M1.0 Civil drawing C5.0 shows the storm drain connection to the building at column line #2 on the west (opposite) side of the building. Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. M1.1 The 2" CW main to the hangar is fed through a reduced pressure backflow preventer. Please clarify pipe labeling and outlet signage per 603.4.11. RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. M1.1 Rainleader cleanouts are required above grade before penetrating the slab and connecting to the underground horizontal piping (UPC 1101.12.2). Please address. RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. M1.1 Please clarify the pipe in the mechanical room running N-S at column line "C".RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. M1.2 There does not appear to be a connection of the HWC line to the HW line in the vicinity of the bathrooms. RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. M4.0 Provide rooftop gas piping to the RTU's and location of the gas pressure reducing valve. RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. M7.0 Detail #1 shows 3/4" CW makeup to the boiler system. Detail #3 indicates a 3/4" glycol makeup to same. Please clarify. RESOLVED PER RESUBMITTAL RECEIVED 7-7-10. When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised plumbing pages to include clouded changes, engineers stamp and signature. RESOLVED 7-15-10.